Work · Process plant
P&ID sheets in.
Checked lists out.
For a process-plant team, we built software that reads drawings on their own machines and builds the line, valve and equipment lists, with every row traced back to its place on the sheet. The instrument index is a target, not yet extracted.
| # | Line no. | From | To | Size | Spec | Status | Note |
|---|---|---|---|---|---|---|---|
| 001 | 2"-P-1001-A1A | [V-201] | [P-101] | 2" | A1A | verified | |
| 002 | 3"-P-1002-A1A | [P-101] | [E-301] | 3" | A1A | flagged | Size change at reducer, confirm |
| 003 | 2"-CW-1003-B2C | [E-301] | [HDR-01] | 2" | B2C | verified | |
| 004 | 4"-P-1004-A1A | [E-301] | [T-401] | 4" | A1A | conflict | Spec break A1A / B2C not shown |
| 005 | 6"-P-1006-A1A | [T-401] | [P-102] | 6" | A1A | verified | |
| 006 | 2"-P-1007-A1A | [P-102] | [V-202] | 2" | A1A | verified | |
| 007 | 3"-CW-1008-B2C | [HDR-01] | [E-302] | 3" | B2C | verified | |
| 008 | 1"-D-1009-A1A | [V-202] | [DRN-01] | 1" | A1A | flagged | Drain size below spec minimum |
| 009 | 2"-P-1010-A1A | [E-302] | [T-402] | 2" | A1A | verified | |
| 010 | 4"-P-1011-A1A | [T-402] | [P-103] | 4" | A1A | verified | |
| 011 | 2"-N-1012-A1A | [P-103] | [V-203] | 2" | A1A | verified | |
| 012 | 3"-P-1013-A1A | [V-203] | [E-303] | 3" | A1A | verified | |
| 013 | 2"-CW-1014-B2C | [E-303] | [HDR-02] | 2" | B2C | verified | |
| 014 | 4"-P-1015-A1A | [E-303] | [T-403] | 4" | A1A | verified | |
| 015 | 1"-V-1016-A1A | [T-403] | [ATM] | 1" | A1A | verified | |
| 016 | 2"-P-1017-A1A | [T-403] | [P-104] | 2" | A1A | verified |
- Project
- [PROJECT NUMBER]
- Client
- [DEMO CLIENT]
- Drawing
- [DWG-0000-001]
- Drawn
- [INITIALS]
- Sheet
- [01] OF [04]
- Issue
- [ISSUE PURPOSE]
- Rev
- [B]
- Work
- 01
- Deploys
- On-prem
- Input
- P&ID PDF · text layer · vector
- Output
- Lists · reports · DEXPI-style (target)
- Rev
- [A]
The problem
Line, valve and equipment lists are typed up by hand from the drawings, and every revision means checking them again.
- What we built
- Software that reads P&ID PDFs on the client’s own machines and builds line, valve and equipment lists, with every row traced back to its place on the sheet.
- For
- a process-plant team
- Delivered
- On-prem software
How it works
- 01
Input
P&ID PDFs with a text layer or vector text, plus the client’s line-spec table and tag format.
- 02
Extraction
Symbols, text and tags, read from the PDF text layer and linework.
- 03
Connectivity
Lines traced and junctions resolved into a graph of equipment, valves and instruments.
- 04
Validation
Written rules check each row against the spec. Anything they can’t resolve is flagged for an engineer, not guessed.
- 05
Outputs
Lists, a connectivity report and a validation report. DEXPI-style export is a target. Same input, same output on every run.
Deliverables
Issued as “P&ID Extracted Lists”: one workbook per drawing set, on the client’s title block, with a cover sheet, contents, revision history and approval block.
| Document number | Title | Format |
|---|---|---|
| [PROJECT NUMBER]-LNL-[SEQ] | Line List | .xlsx · .pdf |
| [PROJECT NUMBER]-VLV-[SEQ] | Manual Valve List | .xlsx · .pdf |
| [PROJECT NUMBER]-EQL-[SEQ] | Mechanical Equipment List | .xlsx · .pdf |
| [PROJECT NUMBER]-[LIST CODE]-[SEQ] | Instrument IndexTarget | .xlsx · .pdf |
| [PROJECT NUMBER]-[LIST CODE]-[SEQ] | Validation Report | .xlsx · .pdf |
Rev [X]Numbering shown is a sample; client numbering is carried separately as [CLIENT DOCUMENT NUMBER]. [TBC]
TargetInstrument index: a template today, not a list extracted from the drawings.
[DEMO CLIENT] · [PLANT / UNIT]
P&ID Extracted Lists
[PROJECT NAME] — [AREA]
Revision [X] · [ISSUE PURPOSE]
Demo data
Contents
| Document number | Title | Tab | Revision |
|---|---|---|---|
| [PROJECT NUMBER]-LNL-[SEQ] | Line List | Line List | [X] |
| [PROJECT NUMBER]-VLV-[SEQ] | Manual Valve List | Valve List | [X] |
| [PROJECT NUMBER]-EQL-[SEQ] | Mechanical Equipment List | Equipment List | [X] |
Revision history
| Rev | Date | Description | Prepared | Checked | Approved |
|---|---|---|---|---|---|
| [C] | [YYYY-MM-DD] | [Issued for construction] | [INITIALS] | [INITIALS] | [INITIALS] |
| [B] | [YYYY-MM-DD] | [Issued for review] | [INITIALS] | [INITIALS] | [INITIALS] |
| [A] | [YYYY-MM-DD] | [Issued for internal check] | [INITIALS] | [INITIALS] | [INITIALS] |
Approval
| Role | Name | Signature | Date | Organization |
|---|---|---|---|---|
| Prepared | [NAME] | [YYYY-MM-DD] | [ORGANIZATION] | |
| Checked | [NAME] | [YYYY-MM-DD] | [ORGANIZATION] | |
| Approved | [NAME] | [YYYY-MM-DD] | [ORGANIZATION] |
[DEMO CLIENT]
Replace every bracketed field before issue.
On-prem and security
Built for drawing sets that cannot leave the building.
- Deployment
- Runs on the client’s own servers as a signed Docker image. No cloud account needed. [TBC]
- Offline
- Works on air-gapped networks. [TBC]
- Drawings
- Drawings and outputs stay on the client’s network. Nothing is sent to Skarow. [TBC]
- Access and audit
- Per-project access. Every row change in review is logged with the reviewer’s initials. [TBC]
Status
Built[TBC]The lists are built; the instrument index and DEXPI-style export are targets.
- Line list
- Built
- Manual valve list
- Built
- Mechanical equipment list
- Built
- Connectivity and validation reports
- Built
- Instrument index
- Target
- DEXPI-style export
- Target
Start a project
Have drawings or documents that people re-type into lists by hand? Tell us about them.